NIBCO / Center for Excellence, Stuarts Draft, VA

R. E. Lee & Son was selected as the Design and Construction Manager for this major plant expansion. We were involved from project conception through final occupancy. We established the project design & construction budget and schedule. We had the opportunity to have significant input in locating the building on the site, building layout and development of the entire project scope to allow NIBCO to buyout the project under budget and on time. All savings were passed on to the Owner.

Project Highlights

Project Team

Owner: NIBCO, Inc.
Engineer: Triad Engineering, Inc.
Structural Engineer: Nolen Frisa Associates
Contractor: R. E. Lee & Son, Inc.
Mechanical Contractor: Southern Air, Inc.

Project Delivery System

Negotiated Design / Build Manager

Construction Schedule

266 calendar day fast track schedule.

Construction Type

Pre-Engineered Insulated Metal Building, Concrete Foundations and 8″ Reinforced Slabs with Iron Shake Topping, SSR Metal Roof with 10 Year Warranty, Gas Fired Heating and Ventilating, Electrical Substation and Bus Duct System, High Bay Lighting.